Batch Results
This screen is displayed once the batch has been started.

All fields will dynamically update to show the latest values.
The progress bar indicates progress of the batch so far. If the batch overruns, then the progress bar will stay at 100%.
Clicking the 'End Batch' button will stop the current batch. The user will be prompted to confirm their actions. Only authorised users can stop batches. On a pipeline system this will automatically start the next batch.
| Field |
Description |
| The batch number is generated at the setup screen |
| The date of the batch is generated at the setup screen |
| The product of the batch is generated at the setup screen |
| The status of the batch at current. |
| The batch size is generated at the setup screen |
| The 'Batch Loaded' amount is derived from the total flow rate and the duration of the batch (batch loaded = flow rate x duration of the batch in progress) |
| The 'Batch Remaining' amount is derived from the batch size and the batch loaded (batch remainig = batch size - batch loaded) |
| The time and date the batch was started |
| The estimated time until the batch ends during batching is derived from the batch remaining and total flow rate, and start time. (estimated end time = start time + (batch remaining/total flow rate). At the end of the batch, the definitive time record for when the batch completed will be displayed. |
| The overall amount of time it took to complete the batch. (end time - time remaining) |
| The time remaining is shown during batching ( time remaining = batch remaining/total flow rate) |
Completed Batches
Once the batch has completed it will display the final batch results.

From this screen the user can either recalculate the batch results from the sampler results or can print the batch reports.